Which models are part of the Design Bid Build project delivery system?

Prepare for the AGC BIM Construction Management Test. Study with our comprehensive quizzes, featuring flashcards and detailed explanations. Master BIM concepts and excel!

In the context of the Design Bid Build project delivery system, the inclusion of both a Model and a Construction Model is essential for effective project execution. The Design phase typically involves creating a comprehensive Model that outlines the project's design details, specifications, and overall vision. Once the design is finalized and bids are solicited, the focus shifts to the Construction Model, which is crucial during the building phase. This model includes more detailed information necessary for actual construction, including methods, materials, and scheduling.

The Design Bid Build system is characterized by its sequential approach: the design is completed before the construction begins. Therefore, having both the Design Model to outline the intentions and the Construction Model to guide actual building activities reflects the necessary documentation and organization required in this project delivery method. The interplay between these models ensures that the construction is done accurately according to the plans, which is vital for project success.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy